.: home       .: about us    .: announcements     .: contact us
 
Welcome To PtranSolutions.com.

Problem Statement:
Line-to-ground clearance dictates line loading levels in many key situations. Excessive sag from high conductor temperature operations, caused by ambient conditions and line loading, is often the limiting condition. Previously, expensive line reconstruction or reconductoring were the only true solution to this problem.

Solution:
Successful field demonstrations of the Sagging Line Mitigator (SLiM) will give utilities vital information on installing, operating, and maintaining these devices to significantly increase power transmission capacity.

Benefits:

  • SLiM provide fast, economic and effective increase in transmission capacity
  • Proven in research and field trials sponsored by CEC and EPRI
  • Economics compare very favorably on $/MW-mile basis
  • Ease of Installation and no maintenance requirements
  • Click Here To See The SLiM Brochure
     

Copyright © 2006 PtranSolutions.com All Rights Reserved